House update

The house is coming along.  We got 4 boxes of the wrong siding so we had to order the correct stuff.  It will take another 2 weeks to get here.  The garage doors were ordered and are being installed in a couple of weeks.  We have to finish the heating and A/C by next weekend.  I have the upstairs entertainment wiring done.  I’m going to start on the basement this weekend.  I installed surround sound in the walls in the living room, I have cat5e cable run throughout the house for data, I have coaxial cable in every room, and I put speakers in the master bath and master bedroom.  There is also speakers on the front porch, back porch and garage.  That is all controlled in the garage.  All the other entertainment wiring goes to the back room of the basement.  The back room is going to be a server room and house all the electronics for the movie theater.  Lots of wire already and we havn’t even started pulling power.  I’ll try not to wait for 2 weeks before I post again.  I do want to get some more pictures up.

If you enjoyed this post, please consider to leave a comment or subscribe to the feed and get future articles delivered to your feed reader.

Comments

No comments yet.

Leave a comment

(required)

(required)